Purpose of the Project: Building 18 at the Getafe Campus.Library and extension of the Humanities, Journalism, Communication and Documentation Classroom Building.
Surface constructed: 21,153 m2
Liquidation Budget: € 14,729,342+ VAT (€ 857 per m2 above grade)
Developer:Carlos III University of Madrid
Contractor:Acciona Infraestructuras
Project and direction of the works:Estudio Beldarrain
Executive management: Mace Management Services
Installations: R.Úrculo Ingenieros Consultores
Structure: Arquing SL (has drawn up the project)/ Valladares Ingeniería SL (technical assistance in the works)
LEED consultants: Indra (project consultancy)/ Vega Ingeniería (works consultancy)
Photography: Francisco Berreteaga
LEED PLATINUM CERTIFICATION

Awards
ASCER awards 2014 (Tile of Spain Awards of Architecture and Interior Design). Finalist project
7th architecture & interior design awards 2014 of the Porcelanosa Group. Porcelanosa Prize for energy efficiency and sustainability
56th FAD Architecture Awards 2014. Selected Project

Publications
“Arquitecturas Cerámicas” (online magazine). May 2014. http://www.ceramicarchitectures.com/es/obras/aulario-biblioteca/
“Promateriales” magazine. No. 76 May 2014
“Arquitectura Viva” magazine. No. 162 April 2014
“LifeStyle & Porcelanosa” magazine. No. 23 January 2014
“Guía de Estudios de Arquitectura” Promateriales guide 2014-2015
“Archdaily” digital publication. March 2014
“SmartPhone Architecture” book. Mónica Calzada
“I-3” digital magazine. Magazine of the Carlos III University in Madrid. No. 41